How to Steel Structural Parts Production?

The production of steel structural components is a rigorous, systematic process. It typically begins with project preparation and raw material inspection, followed by layout and marking to establish dimensions. The components are then shaped through cutting, machining, assembly, and welding, and finally undergo anti-corrosion coating and factory inspection. Each stage is closely interlinked to ensure that the finished components meet design specifications and safety standards.

Proceso de producción de componentes de estructuras de acero.

La seguridad y durabilidad de edificios de estructura de acero depend on the manufacturing quality of each individual steel component. Any dimensional deviation or welding defect can compromise the safety of the entire structure.

Therefore, the production of steel components must strictly adhere to the building standards of the project location. Every step—from raw materials to the finished product—must be precisely controlled, with quality management integrated throughout the entire process to ensure defects are promptly eliminated.

Khome has established a rigorous quality management system; we oversee every stage of production with meticulous care to guarantee the quality of each component and ensure the safety of the entire building.

1. Inspección de material entrante

Before production begins, steel must be purchased from reputable mills. Upon arrival, it shall undergo strict inspection of chemical composition and mechanical properties (such as yield strength and tensile strength). Only materials that pass all tests are allowed to be accepted into inventory and put into use.

KHOME insists on long-term strategic cooperation with reputable steel mills. We also enforce incoming material inspection standards. These standards are even stricter than national requirements.

2. Stakeout

  • Stakeout: Draw full-scale (1:1) patterns on the layout table, verify drawing dimensions and hole spacings, making templates and sample rods for cutting, bending, milling, planing, hole making, etc., for subsequent processing.

3. Draw Lines

Incluyendo verificar y comprobar el material, marcar el corte, fresado, cepillado, perforación y otras posiciones de procesamiento en el material, perforar agujeros, marcar el número de pieza, etc. La determinación del material debe prestar atención a los siguientes problemas:

  • De acuerdo con la lista de ingredientes y la plantilla, los conjuntos se cortan para ahorrar materiales tanto como sea posible.
  • Debe ser propicio para el corte y garantizar la calidad de las piezas.
  • Cuando el proceso tiene normativa, los materiales deben ser tomados de acuerdo a la normativa.

4. Blanking and Cutting

Materials are cut according to drawing specifications. Different cutting equipment is used for different needs. This ensures that all parts meet precise dimensional requirements.

Common cutting methods include the following:

  • Flame cutting. This is suitable for thick plates.
  • Plasma cutting. It offers fast speed and high precision.
  • Laser cutting. It provides the highest precision but comes at a higher cost.

After cutting, all slag and burrs must be removed. This step ensures clean and ready-to-use workpieces.

Cutting not only separates the basic profile of the part but often simultaneously machines the weld bevel, preparing it for subsequent assembly.

5. Hole Making and Edge Processing

Hole making and edge processing further define the connection characteristics of steel components.

High-strength bolted connections are a primary method for joining steel structures. So, the precision of bolt holes directly impacts installation quality. Utilizing CNC drilling machines or 3D drilling machines ensures positional accuracy across hole patterns.

Edge processing involves milling or grinding away any hardened layers or minor defects resulting from the cutting process, thereby ensuring the quality of welded joints.

6. Steel Structure Components Assembly

The assembly of steel structural components refers to the process of joining cut steel plates, profiles, and other parts—using tack welding or connecting elements—to form integral structural members (such as H-beams, columns, and girders).

Methods include ground sampling method, copy copy assembly method, vertical assembly method, tire mold assembly method, etc.

This process is carried out on specialized assembly platforms or jigs, utilizing positioning blocks, clamps, and measuring tools to ensure the precise relative positioning of the parts. At this stage, the steel components are secured only by temporary tack welds in preparation for final welding.

7. Soldadura

Welding is a critical process in the fabrication of steel structural components. It imparts the final structural integrity to the members. Commonly used methods include manual arc welding, gas-shielded welding, and submerged arc welding. Preheating is required before welding, and post-weld heat treatment is necessary to relieve stress;

At its core, welding involves the localized melting and re-solidification of metal; this process inevitably entails thermal expansion and contraction, leading to welding deformation. Controlling deformation is the primary task at this stage, and methods such as symmetrical welding sequences, pre-setting for reverse deformation, and rigid fixturing are used to keep deformation within permissible limits.

.Descubre más

8. Alisado

Post-welding straightening is essential. Any bending or distortion resulting from the welding process is corrected using mechanical methods (such as a hydraulic press) or localized flame heating.

Following straightening, key dimensions must be re-verified, and the welds subjected to visual inspection and non-destructive testing (such as ultrasonic and magnetic particle testing) in accordance with specifications to confirm that both internal quality and external profile meet the required standards.

9. Treatment Of The Friction Surface

Shot blasting of steel components is a surface treatment process primarily used to remove impurities—such as mill scale, rust, and welding slag—from the surface, while simultaneously increasing surface roughness to enhance the adhesion of subsequent coatings.

Surface pretreatment: Abrasive blasting to Sa 2.5 grade (anchor profile depth of 40–80 μm), with additional grinding within 20 mm of welded areas.

10. Revestimiento

After undergoing final dimensional and shape inspections, the steel components proceed to the coating stage.

Coating is not merely a simple matter of applying paint; it is a systematic protective process.

The process begins with a secondary surface cleaning of the steel components, followed by the application of an anti-rust primer.

Primers are typically zinc-rich or based on an epoxy zinc-rich system, preventing corrosion of the substrate through cathodic protection or a barrier effect. An intermediate coat increases the total coating thickness and enhances the barrier effect, while the topcoat provides weather resistance and the desired color.

Lectura adicional: Instalación y diseño de estructuras de acero

El edificio de acero PEB

Los otros archivos adjuntos adicionales

Preguntas frecuentes sobre construcción

Blogs seleccionados para ti

Once all manufacturing processes are complete, the components enter the pre-shipment preparation stage, which includes:

  • Clearly and securely marking component identification numbers to facilitate on-site identification and lifting.
  • Welding temporary lifting lugs or connection plates at designated locations in accordance with the transportation and installation plan.
  • Performing thorough cleaning and packaging to prevent coating damage or contamination during transit.

At this point, a fully functional steel structural component, clearly identified and ready for on-site installation, is officially complete.

Sobre Nosotros K-HOME

——Fabricantes de edificios metálicos prediseñados en China

Henan K-home Steel Structure Co., Ltd se encuentra en Xinxiang, provincia de Henan. Establecido en el año 2007, capital registrado de RMB 20 millones, con una superficie de 100,000.00 metros cuadrados con 260 empleados. Nos dedicamos al diseño de edificios prefabricados, presupuesto del proyecto, fabricación, instalación de estructura de acero y paneles sándwich con calificación de contratación general de segundo grado.

Tamaño personalizado

Ofrecemos estructuras de acero prefabricadas personalizadas en cualquier tamaño, adaptándose perfectamente a sus múltiples necesidades.

diseño libre

Ofrecemos diseño CAD profesional gratuito. No se preocupe por un diseño deficiente que afecte la seguridad del edificio.

Manufactura

Seleccionamos materiales de acero de alta calidad y utilizamos técnicas de procesamiento avanzadas para garantizar la creación de edificios con estructura de acero duraderos y robustos.

Nuestros ingenieros personalizarán una guía de instalación en 3D para usted. No tendrá que preocuparse por problemas de instalación.

customized steel structure buildings according to your application

K-HOMELos edificios prefabricados con estructura de acero de se han implementado con éxito en numerosos países y regiones del mundo, incluyendo mercados africanos como Mozambique, Guyana, Tanzania, Kenia y Ghana; mercados americanos como Bahamas y México; y países asiáticos como Filipinas y Malasia. Conocemos diversas condiciones climáticas y sistemas de homologación, lo que nos permite ofrecerle soluciones de estructura de acero que combinan seguridad, durabilidad y rentabilidad.

Contacte hoy con nuestro equipo de atención al cliente y nos dedicaremos a crear un edificio con estructura de acero personalizado que se adapte perfectamente a sus necesidades.

Superficie

Longitud (pared lateral, m)

Ancho (pared del extremo, m)

Altura del muro (alero, m)

Aplicación / uso

Otros requisitos

Si nos proporciona la siguiente información le ofreceremos una cotización más precisa del producto.

Diseño personalizado ahora

por qué K-HOME ¿Edificio de acero?

Comprometidos con la resolución creativa de problemas

Adaptamos cada edificio a sus necesidades con el diseño más profesional, eficiente y económico.

Compre directamente del fabricante

Las estructuras de acero provienen de fábrica, con materiales de alta calidad cuidadosamente seleccionados para garantizar su calidad y durabilidad. La entrega directa de fábrica le permite obtener estructuras de acero prefabricadas al mejor precio.

Concepto de servicio centrado en el cliente

Siempre trabajamos con los clientes con un concepto orientado a las personas para comprender no sólo lo que quieren construir, sino también lo que quieren lograr.

1000+

Estructura entregada

60+

países

15+

Experiencias

Contactanos >>

¿Tienes alguna pregunta o necesita ayuda? Antes de comenzar, debes saber que casi todas las construcciones prefabricadas de acero están personalizadas.

Nuestro equipo de ingeniería lo diseñará de acuerdo con la velocidad del viento local, la carga de lluvia, llargo*ancho*altoy otras opciones adicionales. O podríamos seguir tus dibujos. ¡Por favor dígame su requerimiento y haremos el resto!

Utilice el formulario para comunicarse y nos pondremos en contacto con usted lo más rápido posible.

Sobre el autor: K-HOME

K-home Estructura de acero Co., Ltd. Cubre una superficie de 120,000 metros cuadrados. Nos dedicamos al diseño, presupuesto del proyecto, fabricación y instalación de estructuras de acero PEB y paneles sándwich con titulación de contratación general de segundo grado. Nuestros productos cubren estructuras de acero ligeras, edificios PEBcasas prefabricadas de bajo costocasas contenedor, acero C/Z, varios modelos de placa de acero de color, paneles sándwich de PU, paneles sándwich de eps, paneles sándwich de lana de roca, paneles de cámaras frigoríficas, placas de purificación y otros materiales de construcción.